Home>Railroad>Amtrak>by engine>Amtrak 100-149>AMTK 119
Home>Engine Maker>General Electric (GE)>Passenger>P42s>Amtrak 100-149>AMTK 119
Click on an image for a larger view.
Amtrak 119 takes 683 eastbound through Deering Junction on May 15th of 2021.
Photo by John Erickson.
Amtrak 119 takes 683 eastbound through Deering Junction on May 15th of 2021.
Photo by John Erickson.
Amtrak 119 and 683 make a stop at Portland Station on May 18th of 2021.
Photo by John Erickson.
Amtrak 119 and 683 make a stop at Portland Station on May 18th of 2021.
Photo by John Erickson.
Amtrak 119 on 688 at Mountain Junction on May 18th of 2021.
Photo by John Erickson.
Amtrak 119 on 688 at Mountain Junction on May 18th of 2021.
Photo by John Erickson.
MEC 7605 meets Amtrak 119 and Downeaster 688 at Mountain Junction on May 18th of 2021.
Photo by John Erickson.
MEC 7605 meets Amtrak 119 and Downeaster 688 at Mountain Junction on May 18th of 2021.
Photo by John Erickson.
Amtrak 119 and Downeaster 683 at Mountain Junction on May 26th of 2021.
Photo by John Erickson.
Amtrak 119 and Downeaster 683 at Mountain Junction on May 26th of 2021.
Photo by John Erickson.
| Number | Marks | Current Disposition | Eng. Serial No. | Eng. Built: | Date Acquired: |
|---|---|---|---|---|---|
| 119 | AMTK | Active | 49969 | 9/1997 | 9/1997 |
| Eng. Type: | Engine Maker: | Trucks: | Horsepower: | Weight: | Prime Mover: |
| P42DC | GE | B-B, high speed | 4,250 | 268,240 lb | 7FDL16, 4 stroke |
| Traction Motors: | Series: | Air Compressor: | Tractive Effort (starting): | Head-End Power: | Speed: |
| 4 - GE752AH DC motors | Genesis I | 1 - WABCO 3CDCLA | 63,000 lbf | 1 GTA33 alternator, 800 kW, 480 V | 110 mph |
This engine data is primarily from the builders data on the side of the locomotives with inclusions from The Diesel Shop, Wikipedia and others.